PCC can be placed directly in the desired location by truck or truck attachments (see Figures 1 and 2), or can be fed into a placement machine for more accurate and even placement. PCC that is moved excessively once it has been unloaded from the transport truck will tend to segregate (become less homogeneous).

Placement over dowel bars in an intersection.Placement in front of a rolling screed.
Figures 1 and 2. Placement over dowel bars in an intersection. Placement in front of a rolling screed.

During the screeding (or strikeoff) process, excess portions of the roughly placed PCC are cut off in order to bring the slab to the required elevation. This is usually done by dragging a straightedge across the slab at the required elevation.

Teaching this? Figures and worked examples are free to use with credit. Course reading lists

Cite this page

APA

Pavement Interactive. (2018, September 5). PCC placement. HeadLight. Retrieved [the date you read it], from https://pavementinteractive.org/reference-desk/construction/placement/pcc-placement/

ASCE

Pavement Interactive. (2018). “PCC Placement.” HeadLight, <https://pavementinteractive.org/reference-desk/construction/placement/pcc-placement/> ([the date you read it]).

BibTeX

@misc{pavint-pcc-placement,
  author = {{Pavement Interactive}},
  title = {PCC Placement},
  year = {2018},
  publisher = {HeadLight},
  howpublished = {\url{https://pavementinteractive.org/reference-desk/construction/placement/pcc-placement/}},
  note = {Accessed [date]}
}
This address will not change. The citation records the date you read it.
Report an error

Reports go to the editors, who check them against the cited sources. Corrections are noted at the top of the article.

Only if you want a reply. It is not published.