Glossary
Relative yield
The yield of a concrete batch divided by the volume it was designed or ordered to produce. Below 1.00 means the batch is short.
Glossary
The yield of a concrete batch divided by the volume it was designed or ordered to produce. Below 1.00 means the batch is short.